Power Generation / Operations & Maintenance

Saddleback Community College – Mission Viejo, CA

Project: 1.45 MW Cogen Plant for College Campus

Design, project management & equipment supply for a 1.45 MW cogeneration plant serving the campus electrical & hot water supplies. Calpwr was retained by performance contractor, Kinetic Systems, Inc., to supply and support the installation of a new campus power plant. Scope of services included plant electrical engineering, equipment selection, major equipment supply (generators, heat exchangers, switchgear, emissions systems, etc.), project management, startup and commissioning and 10 years of maintenance and operations of the plant.

Saddleback-Sign2      SB_Controller      SB_Gens

 

 

 

 

 

Chaparral High School

Project: 195 kW Cogen Plant for College Campus

Design and construction of a 195kW tri-generation system at Chaparral High Scholl in Temecula, California. The turbines generate electricity and hot water reducing boiler hot water requirements in the winter and hot water for absorption chilling in the summer. This tri-generation system offsets the use of central chillers that run during summer peak hours reducing utility costs significantly.

Chap3Chap2Chap1
 

 

 

 

 

Kaiser Permanente, Elk Grove – Sacramento , CA

Project: 240 kW Cogen System at Utility District Admin. Buildings

Calpwr designed, supplied, and installed the 240 kW plant, which produces about two-thirds of the building electricity needs and all of its domestic hot water and heating. The plant functions as an emergency generator; operating the buildings critical electrical loads indefinitely in the event of a utility outage. System consists of four (4) 60 kW Microturbine generators, heat recovery equipment, fuel gas compressors and ancillaries.

OLYMPUS DIGITAL CAMERA

K1K4